| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Use of wet shoe configuration with intentional over-displacement of cement by 7 barrels to enable wireline perforating without tubing Facility statement and wet shoe details |
Unknown | Completions / Frac |
| Tier 3 | Wellbore designed to enter Bakken Petroleum System outside target spacing unit, requiring notification waiver to adjacent operator Permit application and waiver request |
2025-11-12 | Regulatory / Permitting |
| Tier 3 | Waiver requested for cement evaluation logging, with waiver for density/porosity and resistivity logs Proposed logs section |
Unknown | Regulatory / Permitting |
| Tier 3 | Anti-collision evaluation using gamma ray signatures to identify existing wellbore paths in target zone Anti-collision statement |
Unknown | Directional Drilling |