← Back to Daily Permits

🛢️ Smoky Butte 160-100-6 SWD 1

Hunt Oil Company · Divide County County, ND · File #42606 · Generated 2026-02-06 17:15

API
3302301730
Target Formation
Dakota Group
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 3 Industrial Commission hearing held on November 20, 2025, resulting in order authorizing injection into Dakota Group with conditions.
Order No. 35120
2025-12-22 General Oilfield Services
Tier 3 Water chemical analysis reports generated, including parameters like chloride, sulfate, barium, and resistivity.
Eurofins Analytical Report
2025-11-03 General Oilfield Services
Tier 3 Affidavit of mailing Notice of Application for Fluid Injection to surface owners within 1/4 mile radius, via Federal Express.
Affidavit of Mailing
2025-09-30 General Oilfield Services
Tier 3 Approach permit issued for new access road, including culvert and stop sign requirements.
Divide County Approach Permit
2025-09-25 General Oilfield Services
Tier 3 Groundwater well search within one mile identified one active well, with memorandum and water chemical analysis conducted.
KLJ Memorandum and Analytical Reports
2025-09-15 General Oilfield Services
Tier 3 Immediate notification to NDIC Field Inspector or Bismarck office upon spudding, and Sundry Notice filing within 3 business days including drilling contractor, rig number, and company representative details.⏱ URGENT
Stipulations in Application for Permit
Relative Drilling Rigs
Tier 3 Rat or mouse hole drilled must be constructed with a string of casing and cemented to ground level, secured at surface when not in use, and plugged with cement within reasonable timeframe after rig completion.
Stipulations in Application for Permit
Unknown Drilling Rigs
Tier 3 Detailed drilling operations plan including BOP specifications, casing program, cementing, mud program, and evaluation procedures.
Drilling Operations Plan
Unknown Mud / Fluids
Tier 3 Perimeter berm surrounding entire location, remote or automatic shutdown devices on all equipment, and tank level sensors required.
Stipulations in Application for Permit
Unknown General Oilfield Services
Tier 3 Confidential status granted for all information furnished to NDIC, except production runs, for six months commencing on the date the well is spud.
Stipulations in Application for Permit
Relative General Oilfield Services

🎯 Operator Intent

🔧 Service Relevance

Environmental consulting and lab services
Groundwater assessments and chemical analyses completed in September-October 2025, indicating immediate need for baseline data ahead of operations.
Regulatory compliance and permitting
Hearing and order in November-December 2025, with ongoing notifications required post-spud, creating sustained demand.
Drilling and completion services
Detailed plans outline equipment and procedures, with operations likely imminent following approvals.