| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe sub design with no ability to frac out the shoe; requires bridge plug at toe for isolation. ๐ PERMIT INFORMATION, Conditions of Approval & WELL CONSTRUCTION DIAGRAM Non-standard completion design mandates a bridge plug be set before stimulation, adding a specific wireline service step. |
2026-01-02 | Completions / Frac |
| Tier 3 |
Regulator mandates immediate calls after spud and plug bump, plus monthly conventional rig updates, indicating heightened oversight. ๐ Sundry Form for Well File No.: 42608, REVIEWER COMMENTS Specific, non-standard reporting requirements imposed by regulator due to the unconventional drilling plan. |
2026-08-14 | Drilling Rigs |
| Tier 3 |
Operator requests 90-day suspension of drilling to spud with smaller rig (Noble 4), then complete with larger rig (Noble B12) for cost/time savings.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 42608, DESCRIPTION (OPERATOR) Unusual two-rig strategy to reduce costs; creates a defined timeline for two separate rig mobilizations. |
2026-08-10 | Drilling Rigs |
| Tier 3 |
Open hole log waiver granted based on offset well data, eliminating standard logging run. ๐ Sundry Form for Well File No.: 42608, DESCRIPTION (OPERATOR) Operator avoids routine open hole logging, reducing service scope for wireline/logging companies. |
2026-03-25 | Regulatory / Permitting |
| Tier 3 |
Well must be drilled back-to-back with another well to justify spacing unit, indicating a multi-well pad sequence.โฐ TIME-SENSITIVE ๐ PERMIT INFORMATION, Stipulation Permit approval is conditional on drilling another well sequentially, locking in follow-on drilling activity. |
2026-01-02 | General Oilfield Services |