๐Ÿ›ข๏ธ WEST SHELL 2-9-4H

IRON OIL OPERATING, LLC ยท Mountrail County, ND ยท File #42608 ยท Generated 2026-11-25 04:31

API
3306105634
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe sub design with no ability to frac out the shoe; requires bridge plug at toe for isolation.
๐Ÿ“„ PERMIT INFORMATION, Conditions of Approval & WELL CONSTRUCTION DIAGRAM
Non-standard completion design mandates a bridge plug be set before stimulation, adding a specific wireline service step.
2026-01-02 Completions / Frac
Tier 3 Regulator mandates immediate calls after spud and plug bump, plus monthly conventional rig updates, indicating heightened oversight.
๐Ÿ“„ Sundry Form for Well File No.: 42608, REVIEWER COMMENTS
Specific, non-standard reporting requirements imposed by regulator due to the unconventional drilling plan.
2026-08-14 Drilling Rigs
Tier 3 Operator requests 90-day suspension of drilling to spud with smaller rig (Noble 4), then complete with larger rig (Noble B12) for cost/time savings.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 42608, DESCRIPTION (OPERATOR)
Unusual two-rig strategy to reduce costs; creates a defined timeline for two separate rig mobilizations.
2026-08-10 Drilling Rigs
Tier 3 Open hole log waiver granted based on offset well data, eliminating standard logging run.
๐Ÿ“„ Sundry Form for Well File No.: 42608, DESCRIPTION (OPERATOR)
Operator avoids routine open hole logging, reducing service scope for wireline/logging companies.
2026-03-25 Regulatory / Permitting
Tier 3 Well must be drilled back-to-back with another well to justify spacing unit, indicating a multi-well pad sequence.โฐ TIME-SENSITIVE
๐Ÿ“„ PERMIT INFORMATION, Stipulation
Permit approval is conditional on drilling another well sequentially, locking in follow-on drilling activity.
2026-01-02 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Rig Services
Two distinct rig mobilizations are scheduled: Noble 4 for spud around July 15, 2026, and Noble B12 to move on around September 2, 2026.
Wireline & Downhole Tools
Wet shoe sub design requires a bridge plug to be set at the toe for isolation before stimulation, creating a specific wireline service need.
Waste & Environmental Services
Cuttings disposal contract with Roughrider Disposal is pre-identified; filter sock container requirement is in effect from spud.
Civil Construction & Surveying
Uintah Engineering & Land Surveying has completed detailed pad and access road designs; location construction must follow specific NDIC inspector notification.