🛢️ MARY 25-36-1-12 1H

Phoenix Operating LLC · McKenzie County, ND · File #42616 · Generated 2026-02-06 17:15

API
3305310754
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 3 Dirt work scheduled, indicating imminent construction start.⏱ URGENT
PERMIT INFORMATION Type of Work: New Well - Horizontal API: 3305310754 File Number: 42616 [Dirt Work Date: 02/01/2026
2026-02-01 General Oilfield Services
Tier 3 Waiver granted for collection of drill cutting samples in vertical portion from Base of Last Salt to curve kickoff point, with 30-foot samples collected in curve and lateral sections.
Sundry Form File Number: 42616, DESCRIPTION (OPERATOR)
2026-01-09 Regulatory / Permitting
Tier 3 Waiver granted for open hole logs, relying on offsetting well NDIC #33652 for formation tops, with GR-CBL run from TD to ground level.
WELL SUNDRY FORM FILE NUMBER: 42616, DESCRIPTION (OPERATOR)
2026-01-09 Regulatory / Permitting
Tier 3 Anti-collision measures include steering wellbores away from existing dry wells and 30' surveys in build/drop sections.⏱ URGENT
FS PHOENIX | ceaganvs January Sth, 2026 SUBJECT: Mary Pad (MARY 25-36-1-12 1H, 2H, 3H, 4H & 1 SWD) — Proposed well pad location
2026-01-08 Directional Drilling
Tier 3 Proximity to landslide reviewed by ND Geological Survey, no major concerns noted.
From: Holweger, Todd L. Sent: Friday, January 2, 2026
2026-01-05 General Oilfield Services
Tier 3 Backbuild order waiver for spacing unit entry outside target horizon.⏱ URGENT
PHOENIX OPERATING LLC December 31, 2025 RE: Mary Pad (Mary 25-36-1-12 1H, 2H, 3H, 4H) — Backbuild Order Waiver
2025-12-31 Regulatory / Permitting
Tier 3 Well design includes wet shoe with ability to frac out the toe, enabling frac operations through the shoe.
Well: MARY 25-36-1-12 1H, Surf Casing -9 5/8" @ 2320'
Unknown Completions / Frac

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and surveying
Taktikal Directional engaged for wellbore design; dirt work imminent on 02/01/2026, requiring precise surveying for KOP and lateral.
Earthwork and construction
UELs surveying completed; dirt work starts 02/01/2026, creating opportunities for pad grading, berm construction, and stabilization.
Waste management and disposal
Select Water Solutions for cuttings; drilling phase follows dirt work, necessitating disposal services to maintain compliance.
Environmental monitoring and spill response
SWPPP inspections required; SASR membership for emergency response during active operations post-02/01/2026.