| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Backbuild order waiver for spacing unit to allow drilling outside target DSU December 31, 2025 letter |
2025-12-31 | Regulatory / Permitting |
| Tier 2 | Utilization of a wet shoe with ability to frac out the toe Well casing description |
Unknown | Completions / Frac |
| Tier 3 | Waiver of open hole logging requirement, relying on offsetting well Mary 25-36-1-12 4H (NDIC File #8167) for formation tops, with GR-CBL planned from TD to ground level Page 1, REVIEWER COMMENTS |
2026-01-09 | Regulatory / Permitting |
| Tier 3 | Anti-collision measures including 30' surveys in build/drop sections and steering away from existing dry wells⏱ URGENT January Sth, 2026 letter |
2026-01-05 | Directional Drilling |
| Tier 3 | Closed loop drilling system with cuttings disposal at Select Water Solutions, LLC SWPPP Guidance Document |
Relative | General Oilfield Services |