🛢️ ALE 1534-5BH

KODA Resources Operating, LLC · Divide County, ND · File #42621 · Generated 2026-02-06 17:15

API
3302301734
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Conditions of approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe, with south setback based on this
STIPULATIONS section
Unknown Completions / Frac
Tier 3 Dirt work date set for June 1, 2026⏱ URGENT
PERMIT INFORMATION
2026-06-01 General Oilfield Services
Tier 3 Request for waiver from three-day waiting period prior to construction/operations following APD approval⏱ URGENT
AFFIDAVIT- REQUEST FOR WAIVER TO THREE-DAY WAITING PERIOD
2025-11-14 Regulatory / Permitting
Tier 3 Waiver request from NDIC Order 31973 for providing directional drilling plans to adjacent spacing unit operators, as KODA is the operator of the adjacent unit
Letter to Todd Holweger dated November 6, 2025
2025-11-06 Directional Drilling
Tier 3 Anti-collision avoidance modeling submitted, based on known offset wells within vicinity
Directional Planning / Anti-Collision section and KLX Anticollision Report
2025-11-04 Directional Drilling
Tier 3 No coring, DST, or samples planned; waiver submitted for open hole logs
Evaluation Program section
Unknown Regulatory / Permitting
Tier 3 Specific aquifer stipulation requiring onsite inspection, closed mud system, and impermeable liner on the entire location
STIPULATIONS section
Unknown Mud / Fluids
Tier 3 Hydraulic fracturing planned without any diesel compounds listed
Hydraulic Fracturing Stimulation section
Unknown Completions / Frac

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and MWD services
KLX pre-selected, with drilling planned to start June 2026, requiring immediate availability for anti-collision planning
Hydraulic fracturing with slick water and sand
Completion planned post-TD, with explicit exclusion of diesel, aligning with environmental stipulations
Environmental and fluid management
Aquifer stipulations mandate closed systems and liners, critical from spud date