| Tier 2 | Conditions of approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe, with south setback based on this STIPULATIONS section |
Unknown | Completions / Frac |
| Tier 3 | Dirt work date set for June 1, 2026⏱ URGENT PERMIT INFORMATION |
2026-06-01 | General Oilfield Services |
| Tier 3 | Request for waiver from three-day waiting period prior to construction/operations following APD approval⏱ URGENT AFFIDAVIT- REQUEST FOR WAIVER TO THREE-DAY WAITING PERIOD |
2025-11-14 | Regulatory / Permitting |
| Tier 3 | Waiver request from NDIC Order 31973 for providing directional drilling plans to adjacent spacing unit operators, as KODA is the operator of the adjacent unit Letter to Todd Holweger dated November 6, 2025 |
2025-11-06 | Directional Drilling |
| Tier 3 | Anti-collision avoidance modeling submitted, based on known offset wells within vicinity Directional Planning / Anti-Collision section and KLX Anticollision Report |
2025-11-04 | Directional Drilling |
| Tier 3 | No coring, DST, or samples planned; waiver submitted for open hole logs Evaluation Program section |
Unknown | Regulatory / Permitting |
| Tier 3 | Specific aquifer stipulation requiring onsite inspection, closed mud system, and impermeable liner on the entire location STIPULATIONS section |
Unknown | Mud / Fluids |
| Tier 3 | Hydraulic fracturing planned without any diesel compounds listed Hydraulic Fracturing Stimulation section |