| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 | Anti-collision modeling submitted for pad wells Directional Planning / Anti-Collision |
2025-11-25 | Directional Drilling |
| Tier 3 | Use of KLX Directional for MWD contractor 1. Estimated Formation Tops - MWD Contractor KLX Directional |
Unknown | Directional Drilling |
| Tier 3 | Waiver submitted for open hole logs 5. Evaluation Program |
Unknown | Regulatory / Permitting |
| Tier 3 | Requirement for closed mud system and impermeable liner due to aquifer location STIPULATIONS - Aquifer stipulation |
Unknown | Mud / Fluids |
| Tier 3 | Plug and perf completion with slick water and sand, frac down 7" casing Completion Program |
Unknown | Completions / Frac |
| Tier 3 | Hydraulic fracturing excludes diesel compounds 7. Hydraulic Fracturing Stimulation |
Unknown | Completions / Frac |