← Back to Daily Permits

🛢️ Rystedt 5892 31-28 4B

Oasis Petroleum North America LLC · Mountrail County, ND · File #42634 · Generated 2026-02-06 17:15

API
3306105637
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Operator employs 'wet shoe' configuration for production liner, involving intentional over-displacement of cement by 7 barrels to create uncemented annulus, enabling wireline pump-down of first stage perforating guns to avoid more expensive tubing or tractor methods.
Full Well Details Rystedt 5892 31-28 4B and Details of Standard Wet Shoe Rystedt 5892 31-28 4B
Unknown Completions / Frac
Tier 3 Surface Use Agreement executed with landowner for drilling into off-lease units, affirmed by affidavit dated November 5, 2025.
AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT
2025-11-05 General Oilfield Services
Tier 3 Anti-collision report shows minimum separation factors as low as 0.322 (Level 3 warning) with EXIST HZ OVERAL 5892 11-30T, indicating close proximity drilling.
Anticollision Report Summary
2025-10-21 Directional Drilling
Tier 3 Facility uses indirect heater with NDIC exemption (Case No. 28949 Order No. 31500), set within 60 feet of wellhead and 21 feet of oil tank, with impermeable dikes for containment.
FACILITY STATEMENT
Unknown General Oilfield Services
Tier 3 Anti-collision measures include real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures for identifying existing wellbores, and survey frequency increase to every 93-100 feet when approaching lateral crossings.
ANTI-COLLISION STATEMENT
Unknown Directional Drilling
Tier 3 Operator commits to no use of diesel-based stimulation fluids, explicitly prohibiting compounds with CAS numbers 68334-30-5, 68476-34-6, 68476-30-2, 68476-31-3, 8008-20-6.
DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Unknown Completions / Frac
Tier 3 Pad construction uses existing on-site materials for earthwork, with scoria sourced privately for road surfacing, and dikes constructed of impermeable material with layer-by-layer compaction.
NEW WELL PAD CONSTRUCTION STATEMENT
Unknown General Oilfield Services

🎯 Operator Intent

🔧 Service Relevance

Wireline and perforating services
Wet shoe configuration enables wireline pump-down of guns; immediate opportunity post-cementing for first stage initiation.
Anti-collision and surveying services
Frequent surveys (93-100 ft) and gamma ray correlation required during drilling; urgency in lateral sections near crossings.
Waste disposal and hauling
Cuttings disposal to closest licensed facility post-drilling; timing tied to completion of operations.
Core and sample analysis labs
Samples shipped within 30 days, cores within 180 days of drilling completion; window for geological services.