← Back to Daily Permits

🛢️ Hazy 3316-3BH

KODA Resources Operating, LLC · Divide County County, ND · File #42641 · Generated 2026-02-06 17:15

API
3302301742
Target Formation
Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Approval granted for drilling with specific setbacks (150' north/south, 500' east/west) within 2560-acre spacing unit, contingent on cementing production liner in lateral with wet shoe and frac-out capability.
Stipulations section
Unknown Completions / Frac
Tier 3 Request for waiver of three-day waiting period prior to construction/operations.⏱ URGENT
December 15, 2025 letter
2025-12-15 Drilling Rigs
Tier 3 Anti-collision modeling submitted for offset wells on the pad.
Directional Planning / Anti-Collision
2025-11-24 Directional Drilling
Tier 3 Waiver for filtration system if not utilized, with requirement for leakproof container for filters if system is used.⏱ URGENT
May 30, 2025 letter from NDIC
2025-05-30 Regulatory / Permitting
Tier 3 Closed mud system with no cuttings pit required.
Permit Review Policy
Unknown Mud / Fluids
Tier 3 Waiver submitted for open hole logs; logging limited to base of surface casing to TD with MWD-GR.
Evaluation Program
Unknown Regulatory / Permitting
Tier 3 Completion via plug and perf with slick water and sand pumped down 7" casing; tie-back frac string available for contingencies.
Completion Program
Unknown Completions / Frac
Tier 3 Requirement for remote or automatic shutoff devices on all equipment.
Permit Review Policy
Unknown General Oilfield Services
Tier 3 Use of oil-based mud in intermediate section and produced Bakken salt water in production section.
Drilling Fluids Program
Unknown Mud / Fluids

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and MWD services
KLX selected for planning and execution; anti-collision report dated November 2025 signals immediate need for geosteering post-spud.
Hydraulic fracturing with slick water
Completion design specifies plug-and-perf post-TD; no diesel compounds, creating opportunity for eco-friendly frac providers upon reaching lateral.
Waste management and filtration
Leakproof container required during drilling/clean-out/completion/flow-back; waiver possible if no filtration, but planning needed from spud.