| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Approval granted for drilling with specific setbacks (150' north/south, 500' east/west) within 2560-acre spacing unit, contingent on cementing production liner in lateral with wet shoe and frac-out capability. Stipulations section |
Unknown | Completions / Frac |
| Tier 3 | Request for waiver of three-day waiting period prior to construction/operations.⏱ URGENT December 15, 2025 letter |
2025-12-15 | Drilling Rigs |
| Tier 3 | Anti-collision modeling submitted for offset wells on the pad. Directional Planning / Anti-Collision |
2025-11-24 | Directional Drilling |
| Tier 3 | Waiver for filtration system if not utilized, with requirement for leakproof container for filters if system is used.⏱ URGENT May 30, 2025 letter from NDIC |
2025-05-30 | Regulatory / Permitting |
| Tier 3 | Closed mud system with no cuttings pit required. Permit Review Policy |
Unknown | Mud / Fluids |
| Tier 3 | Waiver submitted for open hole logs; logging limited to base of surface casing to TD with MWD-GR. Evaluation Program |
Unknown | Regulatory / Permitting |
| Tier 3 | Completion via plug and perf with slick water and sand pumped down 7" casing; tie-back frac string available for contingencies. Completion Program |
Unknown | Completions / Frac |
| Tier 3 | Requirement for remote or automatic shutoff devices on all equipment. Permit Review Policy |
Unknown | General Oilfield Services |
| Tier 3 | Use of oil-based mud in intermediate section and produced Bakken salt water in production section. Drilling Fluids Program |
Unknown | Mud / Fluids |