← Back to Daily Permits

🛢️ Hazy 3309-1BHN

KODA Resources Operating, LLC · Divide County County, ND · File #42642 · Generated 2026-02-06 17:15

API
3302301743
Target Formation
Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Request for waiver from NDIC Order 31973, providing directional plan details to adjacent spacing unit operator.⏱ URGENT
Letter dated December 5, 2025
2025-12-05 Directional Drilling
Tier 2 Operator plans to use a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe for setback compliance, enabling hydraulic fracturing through the shoe.
Stipulations - Bakken Setback Summary Statement
Unknown Completions / Frac
Tier 3 Request for waiver to three-day waiting period prior to construction/operations on four-well pad.⏱ URGENT
Letter dated December 15, 2025
2025-12-15 Drilling Rigs
Tier 3 Affidavit of pending surface use agreement executed, with verbal permission for permit submission during negotiations.⏱ URGENT
Affidavit dated November 26, 2025
2025-11-26 General Oilfield Services
Tier 3 KLX Directional Drilling selected as MWD contractor, with detailed well planning report including survey intervals and targets.
KLX Well Planning Report dated November 24, 2025
2025-11-24 Directional Drilling
Tier 3 Drilling fluids program specifies use of produced Bakken salt water for the production interval, with closed loop system and no cuttings pit.
Drilling Fluids Program
Unknown Mud / Fluids
Tier 3 Anti-collision avoidance modeling submitted for all known offset wells within vicinity.
Directional Planning / Anti-Collision
Unknown Directional Drilling
Tier 3 Completion program uses plug and perf method with slick water and sand, pumped down 7" intermediate casing; tie-back frac string available for mechanical issues.
Completion Program
Unknown Completions / Frac

🎯 Operator Intent

🔧 Service Relevance

Directional Drilling and MWD Services
KLX selected with detailed plan dated November 24, 2025; immediate need for geosteering in 20,759 ft lateral starting soon after waiver approval.
Hydraulic Fracturing Services
Plug-and-perf with slick water planned post-TD; urgency from waiver requests suggests frac operations could begin within days of construction start.
Cementing and Liner Services
Specialized wet shoe liner cementing required for frac-out capability; timing tied to drilling completion in early 2026.