| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 | Waiver request for three-day waiting period prior to construction/operations following APD approval.⏱ URGENT AFFIDAVIT- REQUEST FOR WAIVER TO THREE-DAY WAITING PERIOD |
2025-12-15 | Regulatory / Permitting |
| Tier 3 | Waiver request from NDIC Order 31973 for adjacent spacing unit disclosure, as operator is the same. Letter dated December 5, 2025 |
2025-12-05 | Regulatory / Permitting |
| Tier 3 | Wet shoe design on production liner with ability to frac out the toe, enabling stimulation through the shoe. Completion Program section |
Unknown | Completions / Frac |
| Tier 3 | Requirement for operator to contact NDIC Field Inspector prior to location construction.⏱ URGENT Conditions of Approval section |
Unknown | General Oilfield Services |
| Tier 3 | Use of oil-based mud for intermediate interval and produced Bakken salt water for production hole. Drilling Fluids Program section |
Unknown | Mud / Fluids |
| Tier 3 | Plug and perf hydraulic fracturing method pumped down 7" intermediate casing, with tie-back frac string available for mechanical issues. Completion Program section |
Unknown | Completions / Frac |
| Tier 3 | No diesel compounds used in hydraulic fracturing, explicitly listing avoided chemicals. Hydraulic Fracturing Stimulation section |
Unknown | Completions / Frac |