| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Approval granted with specific setback conditions (500' north/south, 150' east/west) within 2560-acre spacing unit, and east setback based on production liner cemented in lateral with wet shoe and frac-out capability. Stipulations section |
Unknown | Completions / Frac |
| Tier 2 | Wet shoe configuration with intentional over-displacement by 7 barrels, creating 400' uncemented annulus for toe initiation via pump-down perforating guns. Details of Standard Wet Shoe section |
Unknown | Completions / Frac |
| Tier 3 | NDIC email noting potential federal permit requirement for wells in spacing units, requiring BLM contact.⏱ URGENT January 14, 2026 email |
2026-01-14 | General Oilfield Services |
| Tier 3 | Waiver requested for notification to adjacent operator under Order No. 31848, as Oasis is the operator of the adjacent spacing unit.⏱ URGENT December 17, 2025 letter |
2025-12-17 | Regulatory / Permitting |
| Tier 3 | Requirement for remote or automatic shutoff devices on all equipment, and leak-proof container for filter media storage.⏱ URGENT Permit Review Policy and Filter Socks letter |
2025-05-30 | General Oilfield Services |
| Tier 3 | Anti-collision precautions include AC guidance from certified planners, real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures for wellbore identification, and surveys every 93-100 ft increasing as needed. Anti-Collision Statement |
Unknown | Directional Drilling |
| Tier 3 | Operator will not use diesel-based stimulation fluids, citing specific CAS registry numbers. Diesel Based Stimulation Fluids section |
Unknown | Completions / Frac |