| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Wet shoe configuration intentionally over-displaced for toe initiation, allowing pump-down of perforating guns. Details of Standard Wet Shoe section |
Unknown | Completions / Frac |
| Tier 3 | Waiver requested for notification to adjacent operator under Order No. 31848, as operator controls adjacent spacing unit.⏱ URGENT Letter from Chord Energy dated December 17, 2025 |
2025-12-17 | Regulatory / Permitting |
| Tier 3 | Anti-collision report details separation factors with multiple wells, including Level 3 warnings for close approaches.⏱ URGENT Anti-Collision Report dated 08 December 2025 |
2025-12-08 | Directional Drilling |
| Tier 3 | Construction commencement requires prior contact with NDIC Field Inspector Dylan Roach.⏱ URGENT Conditions of Approval |
Unknown | General Oilfield Services |
| Tier 3 | Pre-selected licensed disposal facilities for dry cuttings, with instruction to use closest available. Licensed Facilities for Solid Drill Cuttings Disposal section |
Unknown | General Oilfield Services |
| Tier 3 | Operator commits to no diesel-based compounds in hydraulic stimulation fluids, citing specific CAS registry numbers. Diesel Based Stimulation Fluids section |
Unknown | Completions / Frac |