| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Wet shoe configuration for production liner cementing, allowing pump-down of first stage perforating guns on wireline without tubing. Details of Standard Wet Shoe / Grove 5892.31-336BX |
Unknown | Completions / Frac |
| Tier 3 | Waiver requested for notification to adjacent operator under Order No. 31848 because operator is the same.⏱ URGENT Letter from Ryan Emery dated December 17, 2025 |
2025-12-17 | Regulatory / Permitting |
| Tier 3 | Anti-collision report shows minimum separation factor of 1.262 with DUNLIN 5892 31-33 6BX, triggering Level 3 warning.⏱ URGENT Anticollision Report dated 08 December, 2025 |
2025-12-08 | Directional Drilling |
| Tier 3 | Anti-collision evaluation using AC guidance, real-time corrected surveys, 1.2 separation safety factor, and gamma ray signatures for wellbore identification. ANTI-COLLISION STATEMENT |
Unknown | Directional Drilling |
| Tier 3 | Approval granted under Commission Order No. 34892 with conditional drilling corridor within 500' setback and 150' boundaries in 5120-acre spacing unit. STIPULATIONS section |
Unknown | General Oilfield Services |