🛢️ MHA Bullsnake 4892 14-28 2BHP

Oasis Petroleum North America LLC · Dunn County County, ND · File #42651 · Generated 2026-02-06 17:15

API
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration used for liner, intentionally over-displaced by 7 barrels to create uncemented annulus for wireline perforating
Full Well Details section
Unknown Completions / Frac
Tier 3 Permit issued with 1280-acre spacing unit via ICO 34129, covering Sections 28 & 29-148N-92W
Permit letter dated January 15, 2026
2026-01-15 General Oilfield Services
Tier 3 Waiver requested for notification to adjacent operator since Oasis owns the adjacent spacing unit⏱ URGENT
Letter dated January 9, 2026
2026-01-09 Regulatory / Permitting
Tier 3 Anti-collision report shows close approaches to offset wells, with minimum separation factors below 1.5 in some intervals
Anti-collision report dated October 28, 2025
2025-10-28 Directional Drilling
Tier 3 Anticipated drilling and completion dates: 30 days each, starting post-permit issuance⏱ URGENT
Anticipated Starting Dates section
Relative Drilling Rigs
Tier 3 Facility design uses indirect heater with NDIC exemption under Case No. 28949 Order No. 31500, set within 60 feet of wellhead
Facility Statement
Unknown General Oilfield Services
Tier 3 Evaluation program requests waiver for open-hole logs, plans only cement bond log, no DST or cores
Evaluation Program section
Unknown Regulatory / Permitting
Tier 3 No diesel-based compounds in hydraulic stimulation fluids, explicitly listing prohibited CAS numbers
Diesel Based Stimulation Fluids/Compounds section
Unknown Completions / Frac

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and anti-collision services
Anti-collision report dated October 28, 2025, indicates immediate need for real-time surveying to avoid close offsets, with drilling anticipated soon after permit on January 15, 2026
Wireline perforating and completion services
Wet shoe design enables wireline toe initiation, signaling preference for cost-effective methods during completion phase starting ~30 days post-drilling
Drill cuttings disposal and hauling
Listed licensed facilities imply hauling to closest available, with drilling starting post-January 15, 2026, creating timely waste management opportunities
Pad construction and facility installation
Pad layout and facility designs finalized by October 9, 2025, with drilling imminent, indicating urgent need for earthwork and heater setup