๐Ÿ›ข๏ธ MHA Bullsnake 4892 14-28 3BX

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #42652 ยท Generated 2026-11-26 07:12

API
3302505136
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Permit stipulates a 'wet shoe' liner configuration to enable wireline pump-down of first-stage perforating guns.
๐Ÿ“„ Bakken Setback Summary Statement & Horizontal Drill Plan Details
Specifies a non-standard completion design choice that dictates specific perforating and cementing techniques.
2026-01-15 Completions / Frac
Tier 3 Operator requests 90-day suspension of drilling to use a smaller spudder rig for surface hole, then move off and return with larger rig within 90 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Suspension of Drilling
Reveals a staged, cost-saving drilling strategy using two different rigs, creating two distinct mobilization/demobilization events.
2026-06-26 Drilling Rigs
Tier 3 Operator waives open hole logs, relying on offset well logs within a mile, but will run a GR-CBL from TD to surface.
๐Ÿ“„ Sundry Form for Open Hole Log Waiver
Indicates a deviation from standard data acquisition, reducing open-hole logging services but confirming cased-hole evaluation.
2026-03-03 General Oilfield Services
Tier 3 Regulator mandates monthly conventional rig updates to the DMR and immediate calls after spud and plug bump.
๐Ÿ“„ Reviewer Comments on Suspension Sundry
Adds specific, non-standard reporting requirements tied to the two-rig operation, increasing operator administrative burden.
Relative Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rigs
A spudder rig is needed for surface hole in Oct 2026, followed by a conventional rig within a 90-day window. This creates two distinct rig mobilization opportunities.
Cased Hole Logging
Open-hole logs are waived, but a GR-CBL from TD to surface is required, directing logging demand towards cased-hole evaluation services.
Wireline & Perforating
The approved 'wet shoe' liner design necessitates wireline pump-down for the first stage perforations, defining the perforating method.
Civil Construction & Surveying
Pad construction for three wells is detailed with cut/fill volumes and a specific access road, indicating imminent earthwork. KLJ is the named design/survey firm.