| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Use of 'wet shoe' configuration with over-displaced cement by 7 barrels to create uncemented annulus for toe initiation Details of Standard Wet Shoe section |
Unknown | Completions / Frac |
| Tier 3 | Dirt work scheduled for March 28, 2026⏱ URGENT Permit Information |
2026-03-28 | General Oilfield Services |
| Tier 3 | Waiver requested for notification to adjacent operator under Order No. 31848, as operator is the same entity Letter dated November 12, 2025 |
2025-11-12 | Regulatory / Permitting |
| Tier 3 | Cores and samples must be submitted to State Geologist within 30 days of drilling completion⏱ URGENT RE: Cores and Samples letter dated 1/26/2026 |
Relative | General Oilfield Services |
| Tier 3 | Use of indirect heater in lieu of heated treater with setback exemption under Case No. 28949 Order No. 31500 Facility Statement |
Unknown | General Oilfield Services |
| Tier 3 | Anti-collision evaluation using AC guidance reporting, real-time corrected surveys, 1.2 separation safety factor, and gamma ray signatures Anti-Collision Statement |
Unknown | Directional Drilling |
| Tier 3 | No use of diesel-based stimulation fluids, listing specific CAS registry numbers prohibited Diesel Based Stimulation Fluids/Compounds section |
Unknown | Completions / Frac |