← Back to Daily Permits

🛢️ TEAL 5692 13-22 3BW

Oasis Petroleum North America LLC · Mountrail County County, ND · File #42669 · Generated 2026-02-06 17:15

API
3306105647
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Use of wet shoe configuration in production liner, involving intentional over-displacement of cement by 7 barrels to create uncemented annulus for toe initiation without wireline perforating.
Details of Standard WetShoe section.
Unknown Completions / Frac
Tier 3 Dirt work date set for February 1, 2026, indicating planned pad construction start.⏱ URGENT
Permit Information section.
2026-02-01 General Oilfield Services
Tier 3 Imposition of additional stipulations for U-turn horizontal well configuration, requiring as-built directional survey, production liner and cementing details, and prior approval for fracture stimulation procedures if within 500 feet of spacing unit boundary.⏱ URGENT
Letter from NDIC dated January 26, 2026, referencing Commission Order 32914.
2026-01-26 Directional Drilling
Tier 3 Anti-collision report shows minimum separation factors below 1.5 with nearby wells like MALLARD 5692 31-22 5T and others, triggering Level 3 warnings.
Anti-collision Report summary and plots.
2026-01-12 Directional Drilling
Tier 3 Anti-collision precautions include real-time corrected surveys, 1.2 separation safety factor in intermediate sections, and Gamma ray signatures for identifying existing wellbores.
Anti-Collision Statement.
Unknown Directional Drilling
Tier 3 Operator commits to not using diesel-based stimulation fluids, excluding specific CAS registry numbers.
Diesel Based Stimulation Fluids statement.
Unknown Completions / Frac

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and surveying
Urgent need for as-built surveys and real-time anti-collision tools due to U-turn stipulations and proximity warnings, with dirt work starting February 2026.
Fracture stimulation and cementing
Prior approval required for frac procedures near boundaries, and wet shoe setup signals immediate opportunity for liner cementing services post-drill.
Environmental and waste management
Leak-proof filter containers and licensed cuttings disposal required from spud, with no waiver indicated, creating ongoing demand during operations.