| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 | Proposal for backbuild drilling of 5 horizontal wells from a single pad, entering Bakken Petroleum System outside target spacing unit, with waiver request for adjacent spacing unit notification since operator controls it.⏱ URGENT Letter dated January 28th, 2026, to NDIC Permit Manager. |
2026-01-28 | Regulatory / Permitting |
| Tier 3 | Detailed casing and cementing program with specific additives (e.g., Type III, 6% Salt, 2% Calseal, 2% Econolite, 0.3% Versaset, 0.25% Fe-2) and waiting on cement times for compressive strength. Proposed Drilling Plan sections on Casing and Cementing Programs. |
Unknown | General Oilfield Services |
| Tier 3 | Pre-selected disposal facility for drill cuttings: Smoky Butte Environmental LLC, located at 13310 94th Street NW, Fortuna, ND 58844, using closed loop system. Proposed Drilling Plan section on Disposal of Drill Cuttings. |
Unknown | General Oilfield Services |