🛢️ Edward Federal 4797 43-21 3B

Enerplus Resources USA Corporation · Dunn County, ND · File #42673 · Generated 2026-02-06 17:15

API
3302505140
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Dirt work date set for 11/05/2025, with approval conditional on setbacks per Commission Order No. 34663, including wet shoe configuration for south setback to enable frac out.⏱ URGENT
Permit Stipulations and Bakken Setback Summary
2025-11-05 Completions / Frac
Tier 3 Operator required to preserve cores and samples with specific intervals (30° max vertical/build, 200° max horizontal) and deadlines (samples within 30 days of drilling completion, cores within 180 days with possible extension via Form 4).⏱ URGENT
Cores and Samples Letter dated 2/2/2026
2026-02-02 General Oilfield Services
Tier 3 Affidavit affirming Surface Use Agreement executed on 1/29/2026 for drilling into off-lease units, with landowner awareness.
Affidavit dated 1/29/2026
2026-01-29 General Oilfield Services
Tier 3 Email notification on 12/19/2025 regarding potential federal permit requirement due to spacing unit overlap, with waiver requested as same operator.⏱ URGENT
Email from Nathaniel Erbele dated 12/19/2025
2025-12-19 Regulatory / Permitting
Tier 3 Planning report generated on 10/30/2025 with detailed survey, formations, and anti-collision analysis showing minimum separation factors (e.g., 1.499 at 3200 ft MD).
Planning Report dated 10/30/2025
2025-10-30 Directional Drilling
Tier 3 Anti-collision precautions include AC guidance, real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures, and surveys every 93-100 ft increasing as needed.
Anti-Collision Statement
Unknown Directional Drilling

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and surveying
Planning report dated 10/30/2025 and dirt work on 11/05/2025 indicate immediate need for MWD, LWD, and survey services to execute trajectories with 1.2 safety factor.
Cementing and completion
Wet shoe design requires precise cementing (over-displaced by 7 barrels); post-drilling, cores/samples must be shipped within 30/180 days, creating urgency for transport services.
Regulatory and land services
Federal permit potential noted 12/19/2025; SUA affidavit 1/29/2026 signals ongoing need for legal and surveying support in multi-unit operations.