🛢️ Edward Federal 4797 43-21 4B

Enerplus Resources USA Corporation · Dunn County, ND · File #42674 · Generated 2026-02-06 17:15

API
3302505141
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 1 Wellbore must be no closer than 150' from north/south boundaries and 500' from east/west boundaries within 2560-acre spacing unit, with south setback based on production liner cemented in lateral with wet shoe ability to frac out.
Permit Stipulations - NDIC Field Order Info and Bakken Setback Summary
Unknown Completions / Frac
Tier 3 Wells drilled from pad outside target spacing unit into Bakken Petroleum System, with waiver requested for adjacent operator notification per Orders 31848 and 31973, supported by Surface Use Agreement affidavit.
Permit Application Correspondence and Affidavit
2026-01-29 Directional Drilling
Tier 3 Anti-collision planning with detailed survey data, formation tops, and offset well analysis for wells in shared pad.
Anti-Collision Statement and Survey Reports
2025-10-30 Directional Drilling
Tier 3 Leak-proof container required on-site for filter socks and media from spud through flow-back, with waiver possible only via Sundry Notice; solid waste transport requires ND DEQ permit.⏱ URGENT
Filter Socks and Other Filter Media Letter
2014-06-01 Regulatory / Permitting
Tier 3 Requirement to submit all cores, core chips, and samples to State Geologist within 180 days for cores and 30 days for samples post-drilling completion, with potential civil penalties up to $12,500 per violation.⏱ URGENT
Cores and Samples Letter
Unknown General Oilfield Services
Tier 3 Closed mud system required with no cuttings pit, and remote/automatic shutoff devices on all equipment.
Permit Review Policy
Unknown Mud / Fluids

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and surveying
Anti-collision surveys dated 2025-10-30 indicate immediate need for precise wellbore planning ahead of dirt work on 2025-11-05.
Waste management and filtration
Filter container requirement effective from spud, aligning with dirt work start, and sample submission deadlines post-completion.
Cementing and completion
Wet shoe design for frac-out requires specialized liner cementing, relevant during lateral drilling phase.