| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Use of 'wet shoe' configuration on production liner for economic toe initiation, allowing wireline-perforated first stage without tubing or tractor. Full Well Details discussion |
Unknown | Completions / Frac |
| Tier 3 | Notification to BLM for federal permit due to wellbore within spacing unit subject to federal oversight.⏱ URGENT Email from Nathaniel Erbele |
2025-12-19 | General Oilfield Services |
| Tier 3 | Anti-collision report indicates Level 3 warning for proximity to EDWARD FEDERAL 4797 43-21 4B with separation factor of 1.203 at 3100 ft MD.⏱ URGENT Anticollision Report |
2025-11-04 | Directional Drilling |
| Tier 3 | Facility design incorporates indirect heater with NDIC setback exemption under Case No. 28949 Order No. 31500, allowing placement within 60 feet of wellhead. Facility Statement |
Unknown | General Oilfield Services |
| Tier 3 | Operator requests waiver for filtration system container requirement, indicating no filtration operations will be conducted on-site. Filter Socks and Other Filter Media letter |
Unknown | Regulatory / Permitting |