| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Approval granted with specific setback conditions: well bore not isolated by cement must be no closer than 150' from north/south boundaries and 500' from east/west boundaries in 1920-acre spacing unit, based on production liner cemented in lateral with wet shoe and ability to frac out the shoe. Permit Stipulations |
2026-08-01 | Completions / Frac |
| Tier 2 | Backbuild Order Waiver: Wells enter Bakken Petroleum System outside target spacing unit; waiver granted as Phoenix Energy operates adjacent unit. Backbuild Order Waiver Letter |
2026-01-28 | Regulatory / Permitting |
| Tier 3 | No diesel-based compounds in hydraulic stimulation; wet shoe with ability to frac out the toe. Stimulation and Proposed Drilling Plan |
Unknown | Completions / Frac |
| Tier 3 | Closed mud system with no cuttings pit; drill cuttings collected in metal containers and hauled to Smoky Butte Environmental LLC. Permit Review Policy and Disposal of Drill Cuttings |
Unknown | Mud / Fluids |
| Tier 3 | Operator must contact NDIC Field Inspector Robert Stafford prior to location construction.⏱ URGENT Construction Commencement Notification |
Unknown | General Oilfield Services |
| Tier 3 | Perimeter berm required surrounding entire location. Conditions of Approval |
Unknown | General Oilfield Services |