🛢️ DOMINEK 12-13-24 2H

Devon Energy Williston, LLC · Williams County, ND · File #42681 · Generated 2026-02-06 17:15

API
3310506788
Target Formation
Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Use of wet shoe with ability to frac out the toe in lateral completion.
Casing details section
Unknown Completions / Frac
Tier 3 Backbuild order waiver request for drilling outside target spacing unit, with Devon as both applicant and adjacent unit operator.
Letter dated January 29, 2026
2026-01-29 Regulatory / Permitting
Tier 3 Requirement for on-site leakproof container for used filtration systems, including filter socks, starting from well spud through flow-back, with waiver option if no filtration used.⏱ URGENT
NDIC letter dated May 30, 2025
2025-05-30 Regulatory / Permitting
Tier 3 Closed mud system with no cuttings pit required.
Permit Review Policy
Unknown Mud / Fluids
Tier 3 Mandatory prior written notice to Continental Resources for hydraulic fracturing if completions are within 2,640 feet of their wells, including 30-21 days notice, emergency contacts, and schedules.⏱ URGENT
Conditions of Approval
Relative Completions / Frac

🎯 Operator Intent

🔧 Service Relevance

Waste management and filtration systems
Filter container requirement effective from spud, creating immediate need for leakproof containers and disposal services as operations commence.
Directional drilling and completion services
Wet shoe design and frac-out capability indicate specialized casing and completion needs, relevant as drilling approaches lateral section.
Regulatory and surveying services
Plat certification by surveyor and NDIC oversight are prerequisites for dirt work on August 23, 2026, signaling pre-drilling engagement.