| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 | Directional drilling for SWD well to reach bottom hole location 1,908 feet from north line and 2,142 feet from west line, differing from surface location. Permit Application and Order No. 35205 |
2026-02-02 | Directional Drilling |
| Tier 3 | Maximum allowable surface injection pressure set at 1,309 psi, calculated using fracture gradient of 0.8 psi/ft for confining zone. Well Fracture Analysis |
2026-01-13 | Completions / Frac |
| Tier 3 | Injection targeted into Inyan Kara Formation of Dakota Group, with confining zones including Mowry and Swift Formations. UIC Plan, Section 3 |
2026-01-13 | General Oilfield Services |
| Tier 3 | Co-located facilities with planned oil wells on the same pad, sharing berms and containment. UIC Plan, Section 7 |
2026-01-13 | General Oilfield Services |
| Tier 3 | SCADA system with 24-hour monitoring, including high-level alarms on tanks, separators, and tubing pressure/vibration/flow monitoring. UIC Plan, Section 8 |
2026-01-13 | General Oilfield Services |
| Tier 3 | No corrective actions required as no existing wellbores in AOR, but multiple wells permitted on same pad. Appendix B |
2025-11-06 | General Oilfield Services |
| Tier 3 | Anti-collision surveys conducted with minimum separation factors as low as 10.206 at 5295.92 ft TVD, using COMPASS software. Appendix B and Anti-Collision Reports |
2025-11-06 | Directional Drilling |