| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Waiver granted for three-day waiting period prior to construction/operations following APD approval.โฐ TIME-SENSITIVE ๐ Affidavit Request for Waiver Allows operator to commence pad construction and drilling immediately upon permit approval, indicating urgency. |
2026-01-26 | Drilling Rigs |
| Tier 3 |
Aquifer location triggers stringent stipulations: closed mud system, no drilling pit, impermeable liner, perimeter berm, and required field inspection. ๐ Stipulations and Conditions of Approval Adds substantial environmental and operational complexity beyond standard drilling. |
Unknown | Mud / Fluids |
| Tier 3 |
Permit modification to change bottom hole location and add a second intermediate casing string ๐ Proposed Work section Indicates a significant design change from the original permit, suggesting geological or operational reassessment. |
Unknown | Directional Drilling |
| Tier 3 |
Operator plans to submit a sundry to waive open hole logs, relying on MWD data. ๐ Drilling Plan - Evaluation Program Non-routine regulatory request to forego conventional wireline logging, reducing time and cost. |
Unknown | General Oilfield Services |