โ† Back to Daily Permits

๐Ÿ›ข๏ธ TUFTO 6-7-18-19F 1H

DEVON ENERGY WILLISTON, L.L.C ยท Williams County, ND ยท File # ยท Generated 2026-02-11 18:34

API
3310506795
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (10)

Tier Signal Date Service Impact
Tier 3 Permit submitted on 01/22/2026 and approved on 02/06/2026โฐ TIME-SENSITIVE
๐Ÿ“„ Submitted By and Approved By sections
Rapid approval timeline (14 days) indicates urgency or streamlined regulatory process
2026-01-22 General Oilfield Services
Tier 3 Wet shoe with ability to frac out the shoe on production liner
๐Ÿ“„ Conditions of Approval and Proposed Drilling Plan
Specific completion design choice for toe initiation, not standard for all horizontals
Unknown Completions / Frac
Tier 3 Closed mud system required with impermeable liner on entire location
๐Ÿ“„ Aquifer stipulation
Environmental stipulation mandates advanced drilling fluid management, beyond basic pit restrictions
Unknown Mud / Fluids
Tier 3 Operator must not intentionally deviate in any portion of the 17-1/2-inch surface hole
๐Ÿ“„ Conditions of Approval
Non-standard restriction on drilling trajectory, suggesting unique geological or regulatory constraints
Unknown Directional Drilling
Tier 3 Mud logger required on-site from ground level to total depth of 17-1/2-inch surface hole at no greater than 30' sample intervals
๐Ÿ“„ Conditions of Approval
Exceeds standard logging requirements, indicating heightened regulatory scrutiny or operator choice for enhanced monitoring in surface hole
Unknown Mud / Fluids
Tier 3 Cement bond logs required on 13-3/8-inch, 9-5/8-inch, and 7-inch casings with zero-pressure pass on surface casing
๐Ÿ“„ Conditions of Approval
Multiple CBL runs with specific verification steps exceed typical cementing oversight, pointing to operator intent for robust zonal isolation
Unknown General Oilfield Services
Tier 3 First perf point at approx 100' from hard line and 250' from section line
๐Ÿ“„ Proposed Drilling Plan
Precise perforation placement relative to boundaries, suggesting optimized drainage strategy
Unknown General Oilfield Services
Tier 3 Line heater manufactured by either Steffes or JW Williams
๐Ÿ“„ Proposed Work Facilities
Pre-specified vendors for facilities, revealing ecosystem preference
Unknown General Oilfield Services
Tier 3 No diesel-based compounds allowed in hydraulic stimulation
๐Ÿ“„ Proposed Drilling Plan
Prohibits specific CAS numbers in frac fluids, signaling operator preference for alternative chemistries
Unknown Completions / Frac
Tier 3 Ball seat included for testing liner
๐Ÿ“„ Proposed Drilling Plan
Specific tool for liner integrity testing, indicating advanced completion planning
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
With approval in February 2026, drilling could commence soon; non-deviation rule requires high-precision services
Cementing and logging
Multiple CBL requirements post-approval indicate immediate need for specialized cement verification services
Completion and stimulation
Wet shoe and frac-out design signals upcoming toe prep and hydraulic fracturing opportunities following drilling