โ† Back to Daily Permits

๐Ÿ›ข๏ธ TUFTO 6-7-18-19F 2TFH

DEVON ENERGY WILLISTON, L.L.C ยท Williams County, ND ยท File # ยท Generated 2026-02-11 18:34

API
3310506796
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (3)

Tier Signal Date Service Impact
Tier 3 Permit approved with specific legal coordinates for lateral: minimum 622' south at 7" casing point, maximum 21432' south at Total Depth
๐Ÿ“„ Conditions of Approval
Precise directional constraints beyond standard spacing, suggesting optimized trajectory for reservoir access
02/06/2026 Directional Drilling
Tier 3 Lateral cemented with wet shoe and ability to frac out the shoe
๐Ÿ“„ Bakken Setback Summary Statement
Non-standard completion design allowing frac operations directly from the shoe, potentially optimizing stimulation efficiency
Unknown Completions / Frac
Tier 3 Production facilities located at greater distance from occupied dwelling than wellbore due to proximity within 1000 feet
๐Ÿ“„ Operator Assertions - Is the well located off-spacing and if so, has a surface use agreement been executed with the landowner?
Regulatory compliance choice prioritizing noise/vibration mitigation near dwellings, indicating heightened environmental sensitivity
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Permit approved 02/06/2026 with specific azimuth and TVD targets; survey frequency requirements (100' vertical, 30' curve, 90' lateral) necessitate immediate contractor engagement
Cementing and logging
Multiple CBL runs required post-cementing, with time allowances for compressive strength; mud logging from ground level to TD creates near-term demand