โ† Back to Daily Permits

๐Ÿ›ข๏ธ TUFTO 6-7-18-19F 4TFH

DEVON ENERGY WILLISTON, L.L.C ยท Williams County, ND ยท File # ยท Generated 2026-02-11 18:35

API
3310506798
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (3)

Tier Signal Date Service Impact
Tier 3 Utilization of a wet shoe with ability to frac out the toe for the production liner.
๐Ÿ“„ Near end of document, under 'Devon Energy Williston, L.L.C will utilize a wet shoe with ability to frac out the toe.'
Wet shoe design allows for fracking out the toe, enabling potential extension of lateral or specific completion techniques not standard in all Bakken/Three Forks wells.
Unknown Completions / Frac
Tier 3 Well located within 1000 feet of an occupied dwelling, triggering specific permit conditions and affidavit requirement.
๐Ÿ“„ Under 'Is the well or production facility closer than 500' to an occupied dwelling? No' and subsequent affidavit section.
Proximity to dwelling imposes additional regulatory hurdles like location of flares, tanks, and treaters, and requires landowner affidavit for off-spacing operations.
Unknown Drilling Rigs
Tier 3 Permit includes requirement for notification to adjacent operators per NDIC Order 31973, with Devon noting self-notification as operator of adjacent unit.
๐Ÿ“„ In the letter section: 'Per NDIC Order 31973 Devon is required to provide the operator of such adjacent spacing unit...'
Explicit regulatory requirement for inter-operator communication on drilling plans, trajectories, and timelines in shared spacing units.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and completion services
Permit approved on 02/06/2026, with operations planned to commence shortly after, creating immediate opportunity for rig mobilization and specialized completion like wet shoe fracking.
Facility construction and heating
Post-approval phase requires setup of indirect heaters from specified manufacturers, timing construction with drilling start.