| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Access roads 'A' and 'B' with specific lengths (318' and 231') and right-of-way disturbances, including traffic flow diagram from Stanley, ND. ๐ Access Road Map and Traffic Flow Diagram Non-routine as it details custom access infrastructure for remote pad, not typical in basic permits. |
2025-10-10 | Drilling Rigs |
| Tier 3 |
Containment wall and earthen berm design with calculated volumes (69,920 BBLS total containment), including flare stack placement 100' from wellhead. ๐ Volume Evaluation and Containment Details Non-routine regulatory compliance for large-scale containment, exceeding standard single-well requirements. |
2025-10-10 | General Oilfield Services |
| Tier 3 |
Pad layout includes four horizontal wells (1H, 2H, 3H, 4H) and one SWD well, with specific surface hole locations and earthwork quantities indicating large-scale development. ๐ Pad Layout and Earthwork Calculations Non-routine due to detailed multi-well pad design with significant earthwork (30,230 cu yds cut, 19,250 cu yds fill), suggesting accelerated development beyond standard single-well operations. |
2025-10-10 | General Oilfield Services |