| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Backbuild Order Waiver for multiple wells (SPACKLER and CADDYSHACK series) entering Bakken outside target spacing unit ๐ Letter dated February 9, 2026 Waiver request for backbuilding multiple horizontals, simplifying regulatory process for pad development |
2026-02-09 | Directional Drilling |
| Tier 2 |
Use of wet shoe with ability to frac out the toe ๐ Page 5 and Drilling Plan Non-routine completion design allowing toe fracturing, deviating from standard dry shoe setups |
Unknown | Completions / Frac |
| Tier 3 |
Approval conditioned on closed mud system, remote shutoff devices, and contact with NDIC Field Inspector Robert Stafford prior to constructionโฐ TIME-SENSITIVE ๐ Page 1-2 Non-standard environmental and safety requirements beyond basic permit stipulations, indicating heightened regulatory scrutiny for groundwater protection and operational oversight |
2026-02-12 | Mud / Fluids |
| Tier 3 |
Well must be drilled in conjunction with another well meeting 1220' setback from spacing unit boundaries ๐ Page 2 Unusual spacing requirement tied to unit justification, not typical for standalone permits |
Unknown | Directional Drilling |
| Tier 3 |
Proximity to WITTY FEE 41-26 dry hole (115 feet), requiring frac job precautions to avoid adverse effects ๐ Page 3 Anti-collision concerns with nearby abandoned well, necessitating specialized frac design |
Unknown | Directional Drilling |