๐Ÿ›ข๏ธ SPACKLER 27-26-25 2H

Phoenix Operating LLC ยท Divide County, ND ยท File #42710 ยท Generated 2026-02-17 19:42

API
3302301764
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Approval granted under Commission Order No. 34326 with specific setback conditions for 1920-acre spacing unit.
๐Ÿ“„ Page 1, Stipulations
Non-standard setback requirements (500' north/south, 150' east/west) tied to production liner with wet shoe for frac-out capability, indicating regulatory customization for horizontal drilling in Bakken.
Unknown Completions / Frac
Tier 2 Use of wet shoe on production liner with ability to frac out the toe, including backup hydraulic toe sleeve.
๐Ÿ“„ Page under Proposed Work and Tubular Details
Non-standard completion design for toe initiation, with redundancy, indicating intent for efficient lateral access without coiled tubing.
Unknown Completions / Frac
Tier 3 Permit approved with submission date 02/09/2026 and approval date 02/12/2026.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 10, Submitted and Approved By
Rapid approval cycle (3 days), enabling operations start after additional 3 business days post-publication.
2026-02-12 General Oilfield Services
Tier 3 Operator assertion of waiver for backbuild order notification due to self-operating adjacent spacing units under NDIC Orders 31848 & 31973.
๐Ÿ“„ Backbuild Order Waiver Letter
Waives standard inter-operator notices, indicating Phoenix's integrated asset control and reduced external coordination needs.
2026-02-09 Regulatory / Permitting
Tier 3 Drill cuttings disposal to specific licensed facility: Smoky Butte Environmental LLC at 13310 94th Street NW, Fortuna, ND.
๐Ÿ“„ Page under Disposal of Drill Cuttings
Pre-selected disposal vendor in closed-loop system, avoiding pits, and complying with environmental regs.
Unknown Mud / Fluids
Tier 3 Notification to NDIC upon spudding, including drilling contractor and rig details, within 3 business days via Sundry Notice.
๐Ÿ“„ Page 2, Stipulations
Requires immediate post-spud reporting with contractor specifics, exposing operational sequencing and potential rig assignments.
Relative Drilling Rigs
Tier 3 Requirement for closed mud system, remote shutoff devices, and pre-construction contact with NDIC Field Inspector Robert Stafford.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2, Stipulations
Mandates environmental and safety protocols beyond routine permits, including specific inspector contact, signaling heightened regulatory scrutiny in Divide County.
Unknown Mud / Fluids
Tier 3 Commitment to no diesel-based compounds in hydraulic stimulation, listing specific CAS numbers.
๐Ÿ“„ Page under Stimulation
Explicit ban on diesel additives, aligning with NDIC environmental policies, and requiring alternative frac fluids.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Permit approved 02/12/2026, with operations start possible immediately after 3 business days; Taktikal Directional pre-engaged for trajectory.
Environmental disposal
Closed-loop cuttings disposal required upon spud; Smoky Butte Environmental LLC specified, creating immediate contract opportunity.
Frac and completion
Wet shoe design for toe frac-out signals need for specialized completion services post-approval, with no diesel additives.