| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator commits to using a wet shoe with ability to frac out the toe, enabling toe fracturing without sidetrack. ๐ Drilling Plan Section 5. STIMULATION and Wellbore Diagram Non-standard completion design allowing direct toe stimulation, reducing operational complexity and costs compared to traditional dry shoe setups. |
Unknown | Completions / Frac |
| Tier 3 |
Waiver requested and granted for backbuild order notification due to operator controlling adjacent spacing units. ๐ Letter dated February 9th, 2026, SUBJECT: SPACKLER Pad - Backbuild Order Waiver Regulatory exception obtained, allowing accelerated drilling without external notifications, uncommon for multi-unit pads. |
2026-02-09 | Regulatory / Permitting |
| Tier 3 |
Drill cuttings disposal pre-selected to Smoky Butte Environmental LLC, a specific licensed facility. ๐ Drilling Plan Section 4. DISPOSAL OF DRILL CUTTINGS Explicit vendor lock-in for waste management, not typical in basic permits which often allow operator choice. |
Unknown | General Oilfield Services |
| Tier 3 |
Stimulation explicitly excludes diesel-based compounds, adhering to NDIC policy. ๐ Drilling Plan Section 5. STIMULATION Proactive compliance with environmental restrictions, signaling use of alternative frac fluids. |
Unknown | Completions / Frac |