โ† Back to Daily Permits

๐Ÿ›ข๏ธ SPACKLER 27-26-25 5H

Phoenix Operating LLC ยท Divide County, ND ยท File #42713 ยท Generated 2026-02-17 19:44

API
3302301767
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Waiver granted for backbuild order due to Phoenix operating adjacent spacing units, avoiding additional notifications.
๐Ÿ“„ Letter dated February 9th, 2026
Non-routine regulatory accommodation for intra-operator units, reducing bureaucratic delays.
2026-02-09 Regulatory / Permitting
Tier 3 Use of wet shoe with ability to frac out the toe in production liner.
๐Ÿ“„ Proposed Work and Tubular Details sections
Non-standard completion design enabling toe fracturing, differing from dry shoe norms.
Unknown Completions / Frac
Tier 3 Requirement to contact NDIC Field Inspector Robert Stafford prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Named individual contact for pre-construction approval, indicating personalized oversight.
Unknown General Oilfield Services
Tier 3 Multi-well pad development including SPACKLER 27-26-25 1H through 5H and CADDYSHACK 22-23-24 1H through 5H, plus SWD well, indicating large-scale horizontal drilling campaign.
๐Ÿ“„ Well Name and Project Details sections
Reveals intent for simultaneous multi-well operations, not standard single-well permit.
Unknown General Oilfield Services
Tier 3 Specified disposal of drill cuttings to Smoky Butte Environmental LLC, a licensed facility.
๐Ÿ“„ Disposal of Drill Cuttings section
Pre-selected vendor for waste management, not generic disposal.
Unknown General Oilfield Services
Tier 3 Prohibition on diesel-based compounds in hydraulic stimulation, with listed CAS numbers.
๐Ÿ“„ Stimulation section
Explicit environmental restriction on frac fluids, beyond basic regulations.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Permit approved February 2026, with directional plans ready; drilling likely imminent, requiring immediate mobilization of Taktikal Directional.
Waste disposal and environmental services
Closed-loop system specified, with Smoky Butte as pre-selected; operations starting soon post-approval, creating urgent need for cuttings handling.
Completion and fracturing
Wet shoe design and diesel-free stimulation detailed; completion phase follows drilling, signaling near-term opportunity for specialized frac services.