| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Waiver granted for backbuild order due to Phoenix operating adjacent spacing units, avoiding additional notifications. ๐ Letter dated February 9th, 2026 Non-routine regulatory accommodation for intra-operator units, reducing bureaucratic delays. |
2026-02-09 | Regulatory / Permitting |
| Tier 3 |
Use of wet shoe with ability to frac out the toe in production liner. ๐ Proposed Work and Tubular Details sections Non-standard completion design enabling toe fracturing, differing from dry shoe norms. |
Unknown | Completions / Frac |
| Tier 3 |
Requirement to contact NDIC Field Inspector Robert Stafford prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations section Named individual contact for pre-construction approval, indicating personalized oversight. |
Unknown | General Oilfield Services |
| Tier 3 |
Multi-well pad development including SPACKLER 27-26-25 1H through 5H and CADDYSHACK 22-23-24 1H through 5H, plus SWD well, indicating large-scale horizontal drilling campaign. ๐ Well Name and Project Details sections Reveals intent for simultaneous multi-well operations, not standard single-well permit. |
Unknown | General Oilfield Services |
| Tier 3 |
Specified disposal of drill cuttings to Smoky Butte Environmental LLC, a licensed facility. ๐ Disposal of Drill Cuttings section Pre-selected vendor for waste management, not generic disposal. |
Unknown | General Oilfield Services |
| Tier 3 |
Prohibition on diesel-based compounds in hydraulic stimulation, with listed CAS numbers. ๐ Stimulation section Explicit environmental restriction on frac fluids, beyond basic regulations. |
Unknown | Completions / Frac |