โ† Back to Daily Permits

๐Ÿ›ข๏ธ BRYNN FERRARI 15-10-3 4H

Phoenix Operating LLC ยท Divide County, ND ยท File #42714 ยท Generated 2026-02-17 19:44

API
3302301768
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Approval conditioned on wet shoe with ability to frac out the shoe for north setback compliance
๐Ÿ“„ Stipulation section, Page 1
Non-standard setback allowance tied to specific completion technology, enabling tighter spacing
2026-02-13 Completions / Frac
Tier 3 Surface damage agreement executed with landowner for multi-well pad
๐Ÿ“„ AFFIDAVIT OF SURFACE DAMAGE AGREEMENT dated 12th February 2026
Pre-permit surface agreement for off-spacing wells, including legal acknowledgment
2026-02-12 General Oilfield Services
Tier 3 Backbuild order waiver submitted to NDIC, citing self-operated adjacent unitโฐ TIME-SENSITIVE
๐Ÿ“„ Waiver letter dated January 12th, 2026
Waiver for off-spacing entry into Bakken Petroleum System, avoiding standard notifications
2026-01-12 Regulatory / Permitting
Tier 3 Drilling cuttings disposal to specific licensed facility: Smoky Butte Environmental LLC
๐Ÿ“„ DISPOSAL OF DRILL CUTTINGS section
Pre-selected vendor for waste management, deviating from operator self-disposal
Unknown General Oilfield Services
Tier 3 Mandatory contact with NDIC Field Inspector Gunther Harms prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulation section, Page 1
Pre-construction regulatory coordination requirement not typical in all permits
Unknown General Oilfield Services
Tier 3 Prohibition on diesel-based compounds in hydraulic stimulation
๐Ÿ“„ STIMULATION section
Explicit ban on common additives, mandating alternative chemistries
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Detailed trajectory plan with specific DLS and targets indicates immediate need for MWD tools and survey services post-approval
Environmental and waste management
Pre-selected disposal facility and container requirements signal urgent mobilization for cuttings handling upon spudding
Completion and stimulation
Wet shoe design for frac-out and diesel ban imply specialized frac services and alternative fluid vendors needed soon after drilling