๐Ÿ›ข๏ธ EN-Aicha- 156-94-3416H-4

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42717 ยท Generated 2026-02-17 19:46

API
3306105651
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Cemented liner with wet shoe designed to allow frac out the shoe, enabling first stage pumping through the shoe.
๐Ÿ“„ Drilling Prognosis, Completion Equipment section
Non-standard completion technique for Bakken wells, optimizing frac operations by over-displacing cement intentionally.
Unknown Completions / Frac
Tier 3 Affidavit confirming Surface Use Agreement allows drilling into off-lease units, specifying sections 15, 16, 21, 22, 27, 34.
๐Ÿ“„ Affidavit sworn September 11, 2025, by Jennings White
Explicit permission for extended reach into adjacent spacing units, supporting multi-unit development strategy.
2025-09-11 General Oilfield Services
Tier 3 Waiver requested for Order 31973 requirements due to operator being the same for adjacent unit, avoiding need to share plans with itself.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter dated August 5, 2025, from Derek Abrahamsen
Regulatory flexibility leveraged for intra-operator operations, not typical for third-party adjacent units.
2025-08-05 Regulatory / Permitting
Tier 3 Specific anti-collision standards including 1.5 separation factor, real-time surveys, and gamma ray geo-steering, exceeding basic regulatory requirements.
๐Ÿ“„ Page 7, Anti-Collision Statement
Goes beyond standard permit anti-collision checks, indicating proactive risk management in densely drilled area.
Unknown Directional Drilling
Tier 3 Infill well design with no civil work, indicating reuse of existing pad infrastructure for cost efficiency and reduced environmental impact.
๐Ÿ“„ Page 7, PROPOSED WORK section
Standard new wells involve full civil construction; infill designation suggests operator's strategy to optimize existing assets in mature fields.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Anti-Collision Services
Permit approved February 13, 2026, with drilling to commence post-publication; anti-collision planning indicates immediate need for survey and geo-steering tools.
Completion and Fracturing Services
Post-drilling phase expected soon after TD; Halliburton pre-selected for stimulation, signaling urgency for frac crews and equipment mobilization.
Regulatory and Environmental Compliance Services
Submitted September 22, 2025, approved February 13, 2026; leak-proof container and waiver processes highlight ongoing need for compliance support during operations.