โ† Back to Daily Permits

๐Ÿ›ข๏ธ AMBER 1732-10BH

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #42719 ยท Generated 2026-02-19 17:11

API
3302301769
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 3 Waiver request for three-day waiting period, submitted January 26, 2026, citing majority working interestโฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT REQUEST FOR WAIVER TO THREE-DAY WAITING PERIOD
Highlights operator's high working interest (up to 95.65%) enabling waiver, revealing intent to control and accelerate development
2026-01-26 Regulatory / Permitting
Tier 3 Waiver request from NDIC Order 31973 for adjacent spacing unit notification, as operator of both units
๐Ÿ“„ Letter to Todd Holweger, January 22, 2026
Shows operator's dual role in adjacent units, streamlining regulatory process without external notifications
2026-01-22 Regulatory / Permitting
Tier 3 Affidavit of fully executed surface use agreement with surface owner Brent Andersen, effective November 7, 2025
๐Ÿ“„ Affidavit of Fully Executed Surface Use Agreement
Demonstrates proactive legal preparation for multi-well pad, ensuring no delays from surface disputes
2025-11-07 General Oilfield Services
Tier 3 Sundry waiver requested for open hole logs, per drilling plan
๐Ÿ“„ Drilling Plan, Evaluation Program
Deviation from standard porosity and resistivity logging requirements, suggesting cost-saving or expedited completion strategy
Unknown Regulatory / Permitting
Tier 3 Waiver granted for three-day waiting period prior to operations, based on affidavitโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2, Construction Commencement Notification
Indicates operator's intent to expedite drilling start, bypassing standard waiting period to gain competitive advantage in timing
Unknown Regulatory / Permitting
Tier 3 Specific contact with NDIC Field Inspector Gunther Harms at 701-770-2564 prior to constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2, Construction Commencement Notification
Direct assignment of inspector, indicating pre-established relationship or site-specific stipulations
Unknown General Oilfield Services
Tier 3 Anti-collision modeling submitted for offset wells, using KLX tools
๐Ÿ“„ Drilling Plan, Anti-Collision section; KLX Anticollision Report
Non-routine emphasis on collision avoidance in dense pad layout, indicating high-risk design choice
Relative Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and MWD Services
KLX Directional selected for 15,437 ft lateral with 90 ft survey intervals; anti-collision report dated 1/15/2026 signals immediate need for precise surveying in multi-well pad
Regulatory Compliance and Inspection Services
Waiver requests and affidavits submitted in late January 2026, with construction contact required prior to spud; urgency from approved permit on 2/18/2026 creates tight timeline for on-site preparations
Logging and Evaluation Services
Waiver for open hole logs requested, but CBL-VDL-GR-CCL required on intermediate casing; potential shift to digital submission via email post-spud notification