โ† Back to Daily Permits

๐Ÿ›ข๏ธ GINA FERRARI 13-12-1 3H

Phoenix Operating LLC ยท Divide County, ND ยท File #42722 ยท Generated 2026-02-20 18:01

API
3302301771
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditioned on wet shoe with ability to frac out for north setback compliance in 1920-acre spacing unit
๐Ÿ“„ Stipulations section, Page 1
Non-standard setback allowance tied to specific completion technique, enabling tighter spacing than default 150' north/south
2026-02-19 Completions / Frac
Tier 3 Backbuild order waiver for 11 wells on pad, including this well, citing self as offset operatorโฐ TIME-SENSITIVE
๐Ÿ“„ Letter dated February 5, 2026
Waives notification to adjacent operators since operator controls offsets, enabling simultaneous multi-well development
2026-02-05 Regulatory / Permitting
Tier 3 Directional plan and survey report by Taktikal Directional, including trajectory details and anti-collision notesโฐ TIME-SENSITIVE
๐Ÿ“„ Survey Report section, dated 2/2/2026
Pre-engineered lateral with specific DLS, azimuths, and targets, disclaiming liability for third-party data inaccuracies
2026-02-02 Directional Drilling
Tier 3 Mandatory closed mud system with no cuttings pit and remote shutoff devices
๐Ÿ“„ Stipulations section, Page 1-2
Exceeds basic environmental requirements, indicating proactive regulatory compliance for groundwater protection
Unknown Mud / Fluids
Tier 3 Cuttings disposal to Smoky Butte Environmental, LLC via closed loop system
๐Ÿ“„ DISPOSAL OF DRILL CUTTINGS section
Pre-selected licensed facility for temporary collection and haul, avoiding on-site pits
Unknown General Oilfield Services
Tier 3 Prohibition on diesel-based compounds in hydraulic stimulation
๐Ÿ“„ STIMULATION section
Explicit ban on specific CAS numbers, aligning with NDIC policies for cleaner fracs
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling services
Survey report dated 2/2/2026 indicates imminent mobilization for horizontal trajectory with specific anti-collision protocols
Waste disposal services
Pre-selected Smoky Butte for cuttings, aligning with closed-loop system requirement for spudding readiness