| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit expires if well not completed as Saltwater Disposal by February 20, 2027โฐ TIME-SENSITIVE ๐ Page 3 of 10, Date: 2/20/2026 Imposes a strict deadline for completion, indicating urgency in operational timeline |
2027-02-20 | General Oilfield Services |
| Tier 3 |
Tank diking variance approved contingent on submission of as-built site schematic after facility construction ๐ Page 3 of 10, Date: 2/20/2026 Non-standard containment design requiring post-construction documentation |
2026-02-20 | General Oilfield Services |
| Tier 3 |
Approach permit approved on January 8, 2026, for access road construction ๐ Appendix F, Permit #AP2025-098 Recent approval enabling site access and construction |
2026-01-08 | General Oilfield Services |
| Tier 3 |
Notices mailed to landowners within 1/4 mile on December 4, 2025 ๐ Appendix E, Affidavit dated December 4, 2025 Proactive landowner notification for UIC application |
2025-12-04 | General Oilfield Services |
| Tier 3 |
Freshwater wells sampled on December 3, 2025, with results to be uploaded ๐ Appendix B, Affidavit dated December 5, 2025 Baseline water quality testing for regulatory compliance |
2025-12-03 | General Oilfield Services |
| Tier 3 |
SPCC Plan to be implemented within six months of commissioningโฐ TIME-SENSITIVE ๐ UIC Plan, Page 8 Deferred compliance timeline for environmental plan |
Relative | General Oilfield Services |
| Tier 3 |
SCADA remote monitoring with 24-hour alerts for tanks, separators, and flow alarms ๐ UIC Plan, Page 7 Advanced automation for spill prevention beyond standard requirements |
Unknown | General Oilfield Services |
| Tier 3 |
Facility co-located with planned oil wells on the same pad, no plans to take third party volumes ๐ UIC Plan, Page 6 Indicates integrated pad development focused on internal production, not external disposal |
Unknown | General Oilfield Services |
| Tier 3 |
Injection into Inyan Kara Formation with specific pressure and rate limits (300 BPD max, 1628.61 psi max) ๐ UIC Plan, Page 4-5 Non-routine formation choice for SWD with calculated parameters |
Unknown | General Oilfield Services |