โ† Back to Daily Permits

๐Ÿ›ข๏ธ DC GUNNER 6-7-18-19 3H

Phoenix Operating LLC ยท Williams County, ND ยท File #42729 ยท Generated 2026-02-24 18:12

API
3310506800
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Backbuild order waiver granted due to operator owning adjacent spacing unit
๐Ÿ“„ Letter dated February 17th, 2026
Waiver avoids standard notification requirements, indicating operator's integrated asset ownership enabling streamlined operations
2026-02-17 Regulatory / Permitting
Tier 3 Directional survey report prepared by Taktikal Directional
๐Ÿ“„ Survey Report, Created Date: 7:05, February 16 2024
Pre-selected directional service provider with detailed trajectory planning, including anti-collision considerations
2024-02-16 Directional Drilling
Tier 3 Mandated closed mud system with no cuttings pit
๐Ÿ“„ Page 1, Stipulations
Non-standard environmental control measure beyond typical permits, suggesting heightened regulatory scrutiny or operator's proactive compliance strategy
Unknown Mud / Fluids
Tier 3 Requirement to contact specific NDIC Field Inspector Gunther Harms prior to location construction
๐Ÿ“„ Page 1, Stipulations
Pre-selects a specific inspector, potentially indicating established relationships or targeted oversight for this operator in the region
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling Services
Survey report dated February 16, 2024, indicates active planning phase; operators should engage Taktikal or competitors immediately for upcoming spudding
Environmental Compliance and Waste Management
Mandated closed mud system and filter sock container effective June 1, 2014, but reiterated in permit; service providers for leak-proof containment needed on-site from spud