| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Waiver required for porosity and resistivity logs via separate sundryโฐ TIME-SENSITIVE ๐ Page 8 of 10, Date: 2/24/2026 Non-standard logging program requiring pre-approval waiver |
2026-02-24 | Regulatory / Permitting |
| Tier 3 |
Tank diking variance approved contingent on as-built schematic submission post-construction ๐ Page 3 of 10, Date: 2/24/2026 Deviation from standard diking requirements, requiring post-construction compliance |
2026-02-24 | General Oilfield Services |
| Tier 3 |
Directional drilling plan with specific anti-collision modeling required ๐ Proposed Drilling Plan, Page 9 of 10 Uncommon for SWD wells to be directional, involving offset well analysis |
Unknown | Directional Drilling |
| Tier 3 |
Facility co-located with planned oil wells, sharing berms and liners ๐ Facilities Design, Appendix F Integrated design with production facilities, not standalone SWD |
Unknown | General Oilfield Services |
| Tier 3 |
Injection limited to on-pad wells, no third-party volumes planned ๐ Injection Program, Appendix F Restricts injection sources to operator-controlled assets |
Unknown | General Oilfield Services |