๐Ÿ›ข๏ธ DC GUNNER 6-7-18-19 2H

Phoenix Operating LLC ยท Williams County, ND ยท File #42731 ยท Generated 2026-02-25 18:07

API
3310506801
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval granted pursuant to Commission Order No. 34678 with specific setback conditions for 2560-acre spacing unit, including 150' north/south and 500' east/west from boundaries, and production liner cemented with wet shoe for frac-out capability.
๐Ÿ“„ Stipulations section, Page 1
Non-standard setback requirements tied to specific order, indicating regulatory constraints on wellbore placement within the unit.
2026-02-25 Completions / Frac
Tier 2 Operator must utilize a wet shoe with ability to frac out the toe, including backup hydraulic toe sleeve and ball seat for testing liner.
๐Ÿ“„ Proposed Completion section
Specified frac-out capability and testing mechanisms, not standard in all completions.
Unknown Completions / Frac
Tier 3 Requirement to drill in conjunction with a well meeting 1220' setback from east/west spacing unit boundaries to justify the unit.
๐Ÿ“„ Page 2
Imposes sequencing dependency on another well, not typical for standalone permits.
2026-02-25 General Oilfield Services
Tier 3 Backbuild Order Waiver for wells 1H-LL, 2H, 3H, 4H, 5H, proposing horizontal drilling from pad entering Bakken outside target spacing unit, with Phoenix Energy as majority owner of adjacent unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter dated February 17th, 2026
Waiver request for multi-well pad backbuild, bypassing standard notification to adjacent operators due to ownership.
2026-02-17 Regulatory / Permitting
Tier 3 Specific contact required with NDIC Field Inspector Gunther Harms prior to location construction.
๐Ÿ“„ Page 1
Named individual inspector assigned, deviating from generic regulatory contacts.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Surveying
With approval dated 2026-02-25 and submission 2026-02-18, services needed immediately for trajectory planning prior to spudding.
Regulatory Consulting and Surveying
Backbuild waiver submitted 2026-02-17, indicating urgent need for land surveying and permit support to enable pad construction.