โ† Back to Daily Permits

๐Ÿ›ข๏ธ DC GUNNER 6-7-18-19 4H

Phoenix Operating LLC ยท Williams County, ND ยท File #42732 ยท Generated 2026-02-25 18:07

API
3310506802
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditioned on production liner cemented in lateral with wet shoe and ability to frac out the shoe, enabling specific setback compliance.
๐Ÿ“„ Stipulations section, Page 1
Non-standard setback based on frac-out capability, indicating advanced completion design not typical in basic permits.
2026-02-25 Completions / Frac
Tier 2 Waiver for backbuild order granted as Phoenix is majority owner of adjacent spacing unit.
๐Ÿ“„ Letter dated February 17th, 2026
Exempts notification to adjacent operators due to ownership, revealing operator's integrated asset strategy.
2026-02-17 Regulatory / Permitting
Tier 2 Use of wet shoe sub with ability to frac out the toe, including backup hydraulic toe sleeve.
๐Ÿ“„ Drilling Plan, Page 4
Advanced toe design for immediate stimulation access, beyond standard casing.
Unknown Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Gunther Harms prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations, Page 1
Requires pre-construction coordination with specific inspector, not standard in all permits.
Unknown General Oilfield Services
Tier 3 Requirement for closed mud system with no cuttings pit and disposal at 13 Mile Landfill.
๐Ÿ“„ Stipulations and Drilling Plan, Pages 1 and 4
Mandates environmental control measures beyond routine drilling, specifying a licensed off-site disposal facility.
Unknown Mud / Fluids
Tier 3 Prohibition on diesel-based compounds in hydraulic stimulation, listing specific CAS numbers.
๐Ÿ“„ Drilling Plan, Page 4
Explicit ban on certain fluids, indicating environmental or regulatory sensitivity not routine.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Anticollision reports and survey plans indicate active planning phase, with Taktikal Directional engaged for precise execution.
Waste management and disposal
Closed system mandates immediate cuttings handling at 13 Mile Landfill, creating opportunity for transport services post-spud.
Completion and stimulation
Wet shoe design signals readiness for toe fracing, potentially aligning with stimulation crews upon reaching TD.