โ† Back to Daily Permits

๐Ÿ›ข๏ธ DC GUNNER 6-7-18-19 5H

Phoenix Operating LLC ยท Williams County, ND ยท File #42733 ยท Generated 2026-02-25 18:08

API
3310506803
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Use of wet shoe with ability to frac out the toe, backed up by hydraulic toe sleeve and ball seat
๐Ÿ“„ Page 5, Tubular Details; Page 6, Proposed Work
Non-standard completion design allowing frac-out of shoe, differing from typical dry shoes and indicating advanced toe preparation for stimulation
Unknown Completions / Frac
Tier 3 Backbuild waiver granted due to operator owning adjacent spacing unit, per NDIC Order 31848
๐Ÿ“„ Letter dated February 17th, 2026
Waiver avoids standard notification to adjacent operators, suggesting operator consolidation of interests
2026-02-17 Regulatory / Permitting
Tier 3 Prohibition on diesel-based compounds in hydraulic stimulation, listing specific CAS numbers
๐Ÿ“„ Page 5, Stimulation
Explicit ban on diesel additives, aligning with environmental regulations but requiring alternative chemistries
Unknown Completions / Frac
Tier 3 Requirement to contact NDIC Field Inspector Gunther Harms at 701-770-2564 prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Stipulations
Specifies a named individual for pre-construction coordination, indicating potential for expedited approval or site-specific oversight not standard in permits
Unknown General Oilfield Services
Tier 3 Drill cuttings disposal to 13 Mile Landfill located at 13809 66th St NW Williston, ND
๐Ÿ“„ Page 4, Disposal of Drill Cuttings
Specifies a single licensed facility for cuttings, implying operator preference or regional capacity constraints
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Detailed plan with Taktikal Directional indicates immediate need for survey tools and MWD services upon spud, with survey frequency at 100' vertical, 30' curve, 90' lateral
Waste management and cuttings disposal
Closed loop system requires on-site containers and haul to 13 Mile Landfill; filter sock container mandatory from spud through flow-back, creating urgent demand for compliant disposal services