โ† Back to Daily Permits

๐Ÿ›ข๏ธ Dunlin 5892 31-33 2B

OASIS PETROLEUM NORTH AMERICA LLC ยท Mountrail County, ND ยท File #42736 ยท Generated 2026-02-27 18:05

API
3306105653
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner, intentionally over-displaced by 7 barrels to create uncemented annulus for toe initiation.
๐Ÿ“„ Discussion section in permit application
Non-standard liner design allowing wireline pump-down of first-stage perforating guns, avoiding more expensive tubing or tractor methods.
Unknown Completions / Frac
Tier 3 Surface Use Agreement executed with landowner for drilling into off-lease units from pad location.
๐Ÿ“„ Affidavit Affirming Surface Use Agreement dated February 26, 2026
Legal arrangement enabling horizontal reach into adjacent units, with landowner awareness.
2026-02-26 General Oilfield Services
Tier 3 Waiver requested for notification to adjacent operator under Order No. 31973, as Oasis operates both the subject and adjacent spacing units.
๐Ÿ“„ Letter dated January 6, 2026, and Affidavit dated February 26, 2026
Demonstrates operator's control over multiple units, enabling horizontal drilling from outside the target spacing unit without external notifications.
2026-01-06 Regulatory / Permitting
Tier 3 Exemption for indirect heater setback under NDIC Case No. 28949 Order No. 31500, allowing placement within 60 feet of wellhead and 21 feet of oil tank.
๐Ÿ“„ Facility Statement
Regulatory variance for facility design, prioritizing compact pad layout over standard setbacks.
Unknown General Oilfield Services
Tier 3 Anti-collision measures include real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures for wellbore identification, and surveys every 93-100 feet increasing as needed.
๐Ÿ“„ Anti-Collision Statement
Enhanced safety protocols beyond basic requirements, using advanced surveying and logging for collision avoidance.
Unknown Directional Drilling
Tier 3 Pre-selected licensed facilities for solid drill cuttings disposal: Chimney Butte Environmental LLC, Dishon Disposal Inc, Ideal Oilfield Disposal LLC, IHD Solids Management LLC, Petrocomp, Prairie Disposal LLC, Secure Energy Services, Tervita Corporation.
๐Ÿ“„ Licensed Facilities for Solid Drill Cuttings Disposal section
Vendor ecosystem locked in for waste management, with closest facility to be used.
Unknown General Oilfield Services
Tier 3 Commitment to no diesel-based stimulation fluids, excluding CAS numbers 68334-30-5, 68476-34-6, 68476-30-2, 68476-31-3, and 8008-20-6.
๐Ÿ“„ Diesel Based Stimulation Fluids/Compounds section
Explicit avoidance of diesel compounds in fracturing, aligning with environmental regulations and operator preferences.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying services
Anti-collision protocols require frequent surveys and real-time corrections, with permit approval in February 2026 signaling imminent drilling start.
Waste disposal and environmental services
Mandatory on-site filter containers and pre-selected disposal facilities align with spud timing post-permit approval.
Completion and stimulation services
Wet shoe design and non-diesel fluid commitment indicate specialized completion needs following drilling phase.