๐Ÿ›ข๏ธ Dunlin 5892 31-33 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Mountrail County, ND ยท File #42737 ยท Generated 2026-02-27 18:06

API
3306105654
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration in production liner design, allowing pump-down of first stage perforating guns on wireline to avoid more expensive tubing or tractor methods
๐Ÿ“„ Discussion section under Full Well Details
Non-standard liner design for cost-effective toe initiation in horizontal completions, differing from typical cemented liners without over-displacement
Unknown Completions / Frac
Tier 3 Execution of Surface Use Agreement for drilling into off-lease units from pad outside spacing unit
๐Ÿ“„ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT
Formal agreement required under NDIC Order 31973 for horizontal wells outside spacing unit, enabling multi-well pad development
2026-02-26 General Oilfield Services
Tier 3 Requested waiver for open hole logging, with plan for cement bond log only
๐Ÿ“„ 7.) EVALUATION PROGRAM
Deviation from standard porosity and resistivity logging requirements, potentially to expedite operations or reduce costs
Unknown Regulatory / Permitting
Tier 3 Detailed anti-collision statement using gamma ray signatures and real-time surveys for 1.2 separation factor
๐Ÿ“„ ANTI-COLLISION STATEMENT
Advanced collision avoidance measures beyond basic offset reviews, indicating proactive risk management in dense field
Unknown Directional Drilling
Tier 3 Commitment to no diesel-based compounds in hydraulic stimulation fluids
๐Ÿ“„ 10.) DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Explicit avoidance of diesel additives, aligning with regulatory preferences and environmental standards
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Anti-collision requirements with 93-100 ft survey frequency and gamma ray correlation, post-approval (02/27/2026) creating immediate opportunity for high-accuracy MWD and surveying services
Completion and stimulation
Wet shoe design and no-diesel fluids signal need for wireline perforating and alternative chemical suppliers, with anticipated 30-day completion window following drilling
Waste management and disposal
Pre-selected facilities for dry cuttings disposal, with operations commencing after 3rd business day post-publication (likely March 2026), offering persistent demand for licensed haulers
Regulatory and land services
Surface Use Agreement dated 02/26/2026 and surveying by 4Dimension, indicating resolved land issues and readiness for construction, with urgency for pad build-out