๐Ÿ›ข๏ธ Dunlin 5892 31-33 4B

Oasis Petroleum North America LLC ยท Mountrail County, ND ยท File #42738 ยท Generated 2026-03-03 18:03

API
3306105655
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe liner configuration allowing pump-down of first stage perforating guns on wireline, avoiding more expensive tubing or tractor methods.
๐Ÿ“„ Full Well Details section
Non-standard liner design for cost-efficient completion in horizontal wells.
Unknown Completions / Frac
Tier 3 Surface Use Agreement executed for off-spacing drilling into adjacent units, with waiver requested for notification as operator owns adjacent spacing unit.
๐Ÿ“„ Affidavit Affirming Surface Use Agreement and Letter dated January 6, 2026
Legal arrangement for extended reach, enabling multi-unit development from single pad.
2/26/2026 Regulatory / Permitting
Tier 3 Anti-collision measures include real-time corrected surveys, 1.2 separation safety factor, and gamma ray signatures for wellbore identification.โฐ TIME-SENSITIVE
๐Ÿ“„ Anti-Collision Statement and Anti-Collision Report
Detailed anti-collision protocol beyond basic permit requirements, with specific offsets and warnings (e.g., Level 3 warnings for nearby wells).
11/20/2025 Directional Drilling
Tier 3 Indirect heater used with setback exemption under NDIC Case No. 28949 Order No. 31500, allowing placement within 60 feet of wellhead and 21 feet of oil tank.
๐Ÿ“„ Facility Statement
Regulatory exemption for facility design not typical in standard permits.
Unknown General Oilfield Services
Tier 3 No diesel-based stimulation fluids used, with explicit CAS registry numbers listed for avoidance.
๐Ÿ“„ Diesel Based Stimulation Fluids/Compounds section
Proactive environmental choice in stimulation design, not mandated but operator-selected.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Wireline perforating and completion services
Wet shoe design enables wireline access for first-stage fracs, with drilling start anticipated ~30 days post-submission (around March 2026), creating immediate opportunity for specialized tools.
MWD/IFR and gamma logging services
Anti-collision report dated 11/20/2025 indicates use of advanced survey tools; drilling commencement in early 2026 signals timing for real-time monitoring contracts.
Waste disposal and environmental services
Multiple licensed facilities listed for cuttings disposal, with operations starting ~March 2026, offering vendors a window to secure hauling contracts before rig-up.