๐Ÿ›ข๏ธ Dunlin 5892 31-33 6BX

Oasis Petroleum North America LLC ยท Mountrail County, ND ยท File #42740 ยท Generated 2026-03-03 18:04

API
3306105657
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit approval contingent on wet shoe liner configuration for east-west setback compliance, allowing over-displacement of cement to enable wireline perforating.
๐Ÿ“„ Permit Stipulations, Page 2 of 10, Date 2/27/2026
Non-standard liner design to meet setback rules, avoiding more expensive tubing perforating methods.
2026-02-27 Completions / Frac
Tier 3 Requirement for submission of cores and samples to ND Geological Survey within specified timelines (30 days for samples, 180 days for cores) with potential civil penalty for non-compliance.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from ND Geological Survey dated 3/2/2026
Imposes strict post-drilling regulatory deadlines not typical in all jurisdictions, indicating potential delays or costs if not met.
2026-03-02 General Oilfield Services
Tier 3 Surface Use Agreement executed for off-spacing horizontal drilling into adjacent units, with waiver of notification to adjacent operator since operator owns the unit.
๐Ÿ“„ Affidavit Affirming Surface Use Agreement dated 26th of February, 2026; Letter to NDIC dated January 6, 2026
Enables drilling from outside spacing unit, reducing surface footprint but requiring landowner consent.
2026-02-26 Directional Drilling
Tier 3 Anti-collision report shows minimum separation factors as low as 1.077 with nearby wells, using gamma ray signatures and real-time surveys.
๐Ÿ“„ Anti-Collision Statement and Report, Survey Program Date 12/3/2025
Tight proximity to offset wells requires advanced surveying and gamma logging, not routine in all Bakken operations.
2025-12-03 Directional Drilling
Tier 3 Explicit commitment to no diesel-based stimulation fluids, listing CAS registry numbers to avoid.
๐Ÿ“„ Diesel Based Stimulation Fluids/Compounds section
Voluntary avoidance of diesel in fracs, aligning with environmental preferences despite not mandated.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying services
Anti-collision report indicates tight separations requiring frequent surveys (every 93-100 ft); opportunity for real-time MWD tools post-permit approval in late February 2026.
Waste disposal and environmental services
Pre-selected licensed facilities for cuttings; timing aligns with drilling start in approximately 30 days from permit approval (around March 2026).
Completion and stimulation services
Wet shoe design favors wireline perforating; diesel-free commitment opens doors for alternative fluid providers ahead of completion phase.