๐Ÿ›ข๏ธ BRYNN FERRARI 1 SWD

FIREBIRD SERVICES, LLC ยท Divide County, ND ยท File #42749 ยท Generated 2026-03-05 18:10

API
3302301773
Target Formation
Swift
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 3 Permit expires if well not completed as SWD by March 5, 2027โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, Date: 3/5/2026
Strict deadline for completion, implying urgency in operations
2027-03-05 General Oilfield Services
Tier 3 Waiver requested for logs unless otherwise approved by the Director
๐Ÿ“„ Page 5 of 10, Date: 3/5/2026
Deviation from standard logging requirements, suggesting cost-saving or formation-specific decisions
2026-03-05 Regulatory / Permitting
Tier 3 Tank dike variance request approved for facility site, contingent on submission of as-built schematic
๐Ÿ“„ Page 3 of 10, Date: 3/5/2026
Non-standard containment design requiring regulatory approval and post-construction documentation
2026-03-05 General Oilfield Services
Tier 3 Anti-collision modeling completed before spud, with reports based on offset wells
๐Ÿ“„ Proposed Drilling Plan, Section 6
Proactive risk mitigation for directional drilling in dense field
Unknown Directional Drilling
Tier 3 SPCC Plan to be implemented within six months of commissioningโฐ TIME-SENSITIVE
๐Ÿ“„ UIC Plan, Section 8
Post-startup environmental compliance requirement
Relative General Oilfield Services
Tier 3 Co-located SWD facilities with oil facilities within same berms
๐Ÿ“„ UIC Plan, Section 7
Integrated pad design for efficiency, sharing containment
Unknown General Oilfield Services
Tier 3 SCADA remote monitoring with real-time alarms for tanks, separators, and flow rates
๐Ÿ“„ UIC Plan, Section 8
Advanced automation for spill prevention, beyond basic manual monitoring
Unknown General Oilfield Services
Tier 3 Injection fluid sources limited to on-pad wells, with no plans for third-party volumes
๐Ÿ“„ UIC Plan, Section 6
Exclusive sourcing from operator-controlled assets, avoiding external dependencies
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and completion
Permit approved March 2026 with 2027 completion deadline, requiring immediate mobilization for complex trajectory
Environmental and monitoring services
SCADA and SPCC implementation post-commissioning, with six-month window for planning
Water testing and disposal
Fluid sourcing from specific wells necessitates ongoing lab analysis and waste handling