๐Ÿ›ข๏ธ LOGAN FED 4-9-16 1HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #42760 ยท Generated 2026-03-16 18:03

API
3305310764
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 3 Approval conditioned on wet shoe with ability to frac out the shoe for south setback compliance
๐Ÿ“„ STIPULATIONS - Conditions of Approval
Non-standard completion design enabling frac-out of shoe, not typical for routine Bakken horizontals
2026-03-12 Completions / Frac
Tier 3 Requirement for closed mud system with no cuttings pit
๐Ÿ“„ STIPULATIONS - Conditions of Approval
Mandated environmental control beyond basic permit, indicating regulatory scrutiny on cuttings management
2026-03-12 Mud / Fluids
Tier 3 Well must be drilled in conjunction with another well meeting 1220' east/west setback from spacing unit boundariesโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 - In order to justify the spacing unit
Interdependent drilling sequence not evident from permit, requiring coordinated operations
2026-03-12 Drilling Rigs
Tier 3 Federal permit involvement via BLM coordinationโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Doug Jackson
Spacing unit subject to federal oversight, not standard state-only permit
2026-03-11 General Oilfield Services
Tier 3 Notification to adjacent operator Rockport Energy Solutions, LLC with detailed plansโฐ TIME-SENSITIVE
๐Ÿ“„ STATE OF COLORADO - AFFIDAVIT
Required disclosure of trajectory and plans to competitor, revealing off-spacing intent
2026-03-11 General Oilfield Services
Tier 3 Specific disposal of drill cuttings to Select Water Solutions, LLC Special Waste Landfill
๐Ÿ“„ 4. DISPOSAL OF DRILL CUTTINGS
Pre-selected vendor for waste disposal, not routine
Unknown General Oilfield Services
Tier 3 Prohibition on diesel-based compounds in hydraulic stimulation
๐Ÿ“„ 5. STIMULATION
Explicit ban on certain CAS numbers, indicating environmental or regulatory preference for alternative fracs
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and survey services
Detailed trajectory and survey data provided, with planning report dated February 2026, indicating imminent mobilization for high-precision tools
Waste management and disposal
Pre-selected landfill for cuttings, with closed system requirement, creating immediate need for transport and disposal services post-spud